Projects Hydraulic Engineering
Construction of the second lock Trier, Germany
As part of the measures on the Mosel river for the elimination of capacity bottlenecks, a second navigation lock is being built on the landside next to the existing lock Trier.
Restructuring of the port of Schulau as part of the Maritime Mile project in Wedel
Development of the port of Schulau into a modern marina as part of an urban development project.
Cruise liner and ferry terminal Riga, Latvia
Port capacities of the Free Port of Riga are adapted to the continuing growth of the market.
Flood retarding basin Niederpoebel, Germany
The flood retarding basin is part of flood prevention concept in the Eastern Erz Mountains.